Case Study 17: Provision of cable lay, burial and post survey client representatives for OWF installation

Location: German sector, Southern North Sea
Duration: 14 months

 

June – November 2013 and March – October 2014, RMS in collaboration with eos projekt supply, provided multiple client reps throughout the period for offshore survey procedure review, survey, cable lay, trenching/ burial and as-built surveys on the inter array cables installed at Dan Tysk OWF in the German sector.